CONSTRUCTION OF HALL FOR PRODUCTION AND PROCESSING OF MEAT '' MRKSICEVI SALASI '' SRPSKI ITEBEJ

Investor: MRKSICEVI SALASI
Contractor: CELIK d.o.o.
We carried out geodetic works on the construction of a hall for production and processing of meat, with a construction of steel, surface 4800m2

CONSTRUCTION OF THE CAMP IN CACAK FOR THE CONSTRUCTION OF THE E763 HIGHWAY PRELJINA-POZEGA

Investor: CHINA COMMUNICATIONS CONSTRUCTION COMPANY CCCC
Contractor: SEDRA PLUS DOO
The camp covers an area of ​​29 000 m2 and is used to accommodate staff who will participate in the construction of the section of the highway E763 Preljina - Pozega. Roads, halls, and staffing facilities were built.

RECONSTRUCTION OF THE ATHLETIC TRACK

Investor: CACAK CITY
Contractor: BAUWESEN
In order to reconstruct the athletic track for the needs of the Mladost Sports Center, we performed all the geodetic work on this construction site.

RIVER REGULATIONS

For the employer HIDROPUT JUG I DM GRADNJA, we performed the necessary geodetic measurements and markings for the following watercourses: regulation of the South Morava watercourse 950m long near Grdelica, regulation of the South Morava watercourse 542m long near Predejane, regulation of the Mirotin stream in Arilje, regulation of smaller streams in Vrnjacka Banja, construction for a flood protection embankment in the length of 1km in Razanj municipality, regulation of the Nisava river watercourse in Dimitrovgrad.

CONSTRUCTION OF THE VIADUCT IN BESKA

Contractor: CELIK d.o.o.
For the purpose of construction of the Belgrade - Budapest fast railway, we performed geodetic works for the purpose of constructing a 511m long viaduct. The construction of the bridge is made of steel, where every millimeter was taken into account.

GEODETIC WORKS ON CONSTRUCTION OF BULIDING K DISTRICT

Contractor: GEOMEHANICKI TIM
Geodetic works for the purpose of drilling piles at the residential and business building K DISTRICT in Belgrade.

MONITORING OF THE CITY DAM IN CACA

Investor: City of Cacak
For the purposes of obtaining a permit for the operation of the city dam in Cacak, we monitored of movement during the operation of the facility.

CONSTRUCTION OF THE E763 HIGHWAY SECTION SURCIN - OBRENOVAC

Contractor: Sedra plus d.o.o
Geodetic works on the construction embankment of sand 1.5km long for the construction of the E763 highway on the section Surcin - Obrenovac.

CONSTRUCTION OF THE E763 HIGHWAY SURCIN - OBRENOVAC SECTION

Contractor: RAS ENGINEERING
Geodetic works on the construction embankment of crushed stone 0-63 and embankment of crushed stone 0-31 and asphalt construction in the length of 17km of the highway E763 on the section Surcin-Obrenovac.

CONSTRUCTION OF THE E763 HIGHWAY DEPARTMENT OBRENOVAC - LAJKOVAC

Contractor: SHANDONG HI SPEED LTD
Geodetic works on reconstruction of highway E763 section Obrenovac - Lajkovac in length of 12km.

WE HAVE INDIVIDUAL EXPERIENCE ON THE FOLLOWING PROJECTS:

• Construction of the E763 highway section Surcin-Obrenovac
• Construction of the railway track Luka Smederevo-Mala Krsna
• Construction of highway E763 section Obrenovac-Ub
• Construction of EAST IKEA STORE BELGRADE
• Construction of a new toll booth BELGRADE
• Construction of highway E75 section Grabovnica - Grdelica, L = 5.6 km and rehabilitation and modernization of access roads related to highway E75 Grabovnica - Grdelica
• Construction of the E - 80 highway, section Pirot - Dimitrovgrad
• Construction of E - 80 highway, section Prosek - Crvena Reka
• Construction of the E - 80 highway, Dimitrovgrad Bypass - Bulgarian border crossing
• Machine geodesy in the Zelezara Smederevo
• Machine geodesy in the BALL metal products factory